Is $70,000 fair to replace 80 feet of seawall in Port Charlotte?
This page does not say whether any dollar amount is fair. It shows how to tell whether two bids are the same job, and what Florida law and Charlotte County put in writing.
This page will not price the job
Port Charlotte Seawall is an independent referral service, not a contractor, and we never do the work. During the launch period no contractor pays for these referrals. We do not say a quote is fair. We do not quote a price.
The question of whether $70,000 is fair for 80 feet only makes sense after you know what that figure includes. Two numbers are comparable only when they cover the same feet of wall and the same work.
Ask each bidder for the same scope
Ask every bidder to state, in the same list:
- The linear feet of wall the price covers
- Whether demolition and disposal of the old wall are included
- The wall material, the cap, and the tiebacks or anchors
- Whether a dock or boat lift has to come out and go back, and whether that work is in the price. See docks and boat lifts in Port Charlotte.
- Whether engineering, the county permit fee, and any state or federal permit fee are included or extra
- Who pulls the permit, and in whose name
An allowance, or a line that says the permit is the owner's job, is not the same scope as a price that includes those items. This page does not say what a complete price should be.
What Charlotte County requires before the work
For a residential seawall, the county permit page lists an application for a construction permit, an affidavit for accessory structures, a site plan, a survey, and drawings, plans, and engineering that are signed and sealed and show the full extent of the work. A recorded Notice of Commencement is required when the direct contract price is greater than $5,000, and it must be submitted before the first inspection is scheduled.
The same page lists external agency approval as possibly the Florida Department of Environmental Protection and/or the U.S. Army Corps of Engineers. That is the county's word, "possibly." This page does not decide whether your canal needs either approval. Ask the contractor who files it, and ask to see it if they say it applies.
The building review on that page checks the proposed work against the structural requirements of the Florida Building Code, including wind loads and flood loads.
The county's published permit fees are not a construction price, and they are not a way to judge $70,000. For a valuation of $50,000 or more, the building fee is 0.004 times the ICC valuation, plus a surcharge of 0.025 times the building fee. A right-of-way review is $90 and a zoning review is $95. The permit checklist walks through the same list. The shorter overview is seawall permits in Port Charlotte and Charlotte County.
Who the county says can pull the permit
The county lists these as eligible for a residential seawall permit: an owner-builder, who must not rent or sell the property within one year of completion of the permit; certified building, general, marine, and residential contractors; registered building, general, and residential contractors; and local marine construction licensees.
Look the license up at MyFloridaLicense.com and match the classification on the license to that list. Section 489.119 says the registration or certification number shall appear in each offer of services, business proposal, bid, contract, or advertisement used in the practice of contracting.
For the full step-by-step walkthrough, including Charlotte County's own local license lookup, see check a contractor license in Port Charlotte.
What the written contract has to contain
This page does not say Florida requires every seawall agreement to be one standard form. Three statutes do put specific things in writing.
Section 489.119 requires the license number on the bid and on the contract, as quoted above.
Section 489.1425 says each agreement or contract for repair, restoration, improvement, or construction to residential real property must contain a written statement explaining the consumer's rights under the Florida Homeowners' Construction Recovery Fund, except where the value of all labor and materials does not exceed $2,500. The statute prints the statement the contract must substantially follow, including the heading "FLORIDA HOMEOWNERS' CONSTRUCTION RECOVERY FUND."
Section 489.126 says a contractor who receives, as initial payment, money totaling more than 10 percent of the contract price for repair, restoration, improvement, or construction to residential real property must apply for the necessary permits within 30 days after the payment, and start the work within 90 days after the necessary permits are issued, unless the contractor has just cause or the person who paid agreed, in writing, to a longer period. The same section describes where to mail a demand if no written agreement exists. A longer timeline that is not in writing is not the exception the statute describes.
None of these sections says whether a dollar amount is fair.
What this referral will not do
We do not say $70,000 is fair, high, or low. We do not measure your wall, pull the permit, or sign the contract. The contract, if you sign one, is with the contractor. To ask one independent licensed marine contractor to follow up, use the request form. How a request is handled is on how this service works.
Start a free request
Pick what you need. Five short questions.
Reading a seawall quote
Is $70,000 fair to replace 80 feet of seawall in Port Charlotte?
This page does not say whether $70,000 is fair, and it does not say whether any other amount is fair. Ask what the figure includes: the linear feet, demolition, the cap and tiebacks, dock or lift work, engineering, and permit fees. Two bids are comparable only when they include the same work. Sections 489.119, 489.126, and 489.1425 say what has to appear in the writing. They do not set a price.
How do I compare two seawall bids in Port Charlotte?
Ask each bidder to state the linear feet and the same scope, including whether engineering and the county permit are included and who pulls the permit. Charlotte County's residential seawall permit page requires signed and sealed drawings, and it lists a Notice of Commencement when the direct contract price is greater than $5,000. It also lists possible approval from the Florida Department of Environmental Protection or the U.S. Army Corps of Engineers. This page does not decide whether your job needs that approval.
Does Florida law require the contractor's license number on the bid?
Yes. Section 489.119 says the registration or certification number shall appear in each offer of services, business proposal, bid, contract, or advertisement used in the practice of contracting. Look the number up at MyFloridaLicense.com and match it to a license type the county lists as eligible for a residential seawall permit.
What has to be in the written contract?
Section 489.1425 requires a written statement about the Florida Homeowners' Construction Recovery Fund in a residential repair or construction contract, except where the value of all labor and materials does not exceed $2,500. Section 489.126 requires a written agreement if the person who paid more than 10 percent up front agrees to a longer time to apply for permits or to start work. This page does not say every verbal conversation is void. It says those duties are in the statutes.
Sources
- Florida Statutes section 489.119, license number on bids and contracts
- Florida Statute 489.126, contractor deposits and permit timing
- Florida Statute 489.1425, Homeowners' Construction Recovery Fund notice
- Residential Seawall permit (Charlotte County Building Construction)
- MyFloridaLicense.com license lookup (Florida DBPR)
Get your wall looked at
Call or send a request and we will pass it to an independent licensed marine contractor who works Charlotte County canals. Have your address ready and, if you can, a few photos of the wall.