Charlotte County seawall permit checklist

A deeper, printable version of what the county actually asks for, checked against its own permit page on October 3, 2026.

Published October 3, 2026. Reviewed against public sources listed below.

What the county asks for

Charlotte County's residential seawall permit page lists these documents. This goes one level deeper than our overview of the permit process; read that first if you want the short version.

DocumentWho usually handles itOfficial link
Application for Construction PermitYour contractor, or you if you are an approved owner-builderCounty permit page
Signed and sealed drawings, plans and engineeringA Florida-licensed engineer, through your contractorCounty permit page
Site plan and surveyA licensed surveyor, through your contractorCounty permit page
Affidavit for Accessory StructuresYou or your contractor, signed at applicationAffidavit form
Notice of Commencement, for jobs over $5,000You, recorded before the first inspection is scheduledFlorida Statute 713.13
Owner-Builder Disclosure StatementYou, signed in person, owner-builders onlyOwner-Builder form
State or federal review, if your job needs itFDEP and/or the U.S. Army Corps of Engineers, through your contractorCounty permit page

Fees the county charges

FeeAmountWhen it is due
Building fee0.004 times the ICC valuation, for jobs valued at $50,000 or moreAt application
Surcharge0.025 times the building feeAt application
Right-of-way review$90At issuance
Zoning review$95At issuance

The county page states the building fee formula only for valuations of $50,000 or more. For a smaller job, ask the county or your contractor what the building fee will be.

Who can pull the permit

The county's eligible license types are: owner-builder (cannot rent or sell the property within one year of completion), certified building, certified general, certified marine, certified residential, registered building, registered general, registered residential, and local marine construction.

Printable checklist

Print this and check items off before you sign anything.

  • Application for Construction Permit filled out
  • Drawings, plans and engineering signed and sealed
  • Site plan and survey attached
  • Affidavit for Accessory Structures signed
  • Notice of Commencement recorded, if the direct contract price is over $5,000
  • Owner-Builder Disclosure Statement signed, only if you are pulling the permit yourself
  • Confirmed with your contractor whether FDEP or Army Corps review applies to your job
  • Contractor's license checked on MyFloridaLicense.com before signing

Adding or changing a dock or boat lift

Charlotte County's updated rule, effective October 1, 2026, requires every dock and boat lift permit application to include a survey, a site plan, or a hand-drawn site plan to scale, showing the water line and the distance from it to existing and proposed structures. Ask your contractor whether this applies to your project.

Buying rather than building? See our canal home buyer checklist, or send a request and we pass it to an independent licensed marine contractor who works Charlotte County canals.

Get your wall looked at

Send a request and we will pass it to an independent licensed marine contractor who works Charlotte County canals. Have your address ready and, if you can, a few photos of the wall.

Free referral service, not a contractor. Calls to this site are recorded to confirm referrals and for quality. How this works.

Send a requestRequest a callback